Link to todays posts Thursday, July 26, 2007

DDE receipt for Permis de Construire

Got a receipt from the DDE for my permis de construire today, about a month later than expected, but not to worry because the opening paragraph states that maximum delay is fixed by the Code de l'Urbanisme at 2 months. The letter notes that the application was deposited on the 11/6/2007 and states in the letter I should have the result before the 11/08/2007.

Great news.

|   2:11:47 PM  Use this to link to this item