To Do list

Jobs for the next two weeks (w/c 20 Jun 04)

  • Renovate our fireplace
  • Wood preservative on sheds
  • Replace some rotten weatherboarding on Laverie
  • Planters and trellis for hard standing area
  • Repair back fence
  • Green hammerite railings
  • Finish painting windows

Jobs for the next two weeks (w/c 9 May 04)

  • Sand paint external windows doors of two gites
  • Paint internal gite doors
  • Teak oil garden furniture
  • Tidy garage
  • Dump of spiral staircase
  • Connect up rainwater butts

Jobs for the next two weeks (w/c 25 Apr 04)

  • Plumb Cerise sink into new soakaway
  • Finish gravel by laundry room
  • Baby swing maintenance
  • Split last of the oak logs
  • Weed the bottom of the leylandii hedge
  • Move large rocks into the flower bed
  • Dig and clear pergola border
  • Clear hard standing by barn

General